Aquila Coal Mine: YANMAR 10 HP Pump Supply
By Deftec
The Challenge
Anglo American’s Aquila Coal Mine required a reliable 10 HP pump unit to support operational demands at their Middlemount site. With equipment uptime critical in mining operations, sourcing a quality industrial pump that could be rapidly deployed was essential.
Our Approach
Deftec supplied a YANMAR 10 HP pump (QPT-205SLT model) with twin impeller configuration, engineered for the demanding conditions of coal mining operations. Working through Anglo Coal’s procurement process, we managed the quotation, purchase order, and delivery logistics to meet the required deployment timeline of April 2026. Our team coordinated directly with Aquila’s warehouse to ensure seamless integration into their operational inventory.
The Outcome
The pump was successfully delivered to Aquila Warehouse on schedule, providing the mining operation with a quality industrial component ready for deployment. By managing the full supply chain from quotation through delivery, Deftec enabled Aquila to maintain operational continuity without procurement delays.
Technologies & Capabilities
- Industrial pump supply and logistics
- Mining equipment procurement
- Supply chain coordination
- Anglo Coal/Anglo American vendor management
- Queensland-based operational support