Anglo American Mining June 2025

Moranbah North Mine: Domain Changeover Support

SCADA Power Systems

The Challenge

Moranbah North Mine required specialist engineering support to migrate their control system infrastructure across two critical platforms. The operation needed experienced PCS engineers to manage the technical complexities of transitioning both Citect and Ignition domain environments without disrupting mine operations.

Our Approach

Deftec deployed a Senior PCS Engineer with deep expertise in both Citect and Ignition platforms to lead the domain changeover process. We allocated dedicated engineering hours to each platform migration---6 hours for Citect domain transition and 6 hours for Ignition implementation---ensuring methodical, hands-on support throughout the changeover period. This focused technical engagement minimised risk and provided the mine with direct access to specialist knowledge during a critical operational window.

The Outcome

The domain changeover was completed with dedicated senior-level engineering oversight, enabling the mine to transition its control systems confidently and maintain operational continuity. By deploying experienced PCS expertise on-site, we reduced transition complexity and provided the mine with the technical assurance needed for a smooth platform migration.

Technologies and Capabilities

  • Citect SCADA platform migration
  • Ignition SCADA platform configuration and deployment
  • PCS (Process Control Systems) engineering
  • Domain architecture and transition planning
  • Industrial automation system expertise